英文职业感谢信

时间:2021-10-08 16:44:19 感谢信 我要投稿

关于英文职业感谢信3篇

  随着个人的.文明素养不断提升,感谢信不再是罕见的东西,请注意不同种类的感谢信具有不同的用途。相信许多人会觉得感谢信很难写吧,以下是小编收集整理的英文职业感谢信3篇,希望对大家有所帮助。

关于英文职业感谢信3篇

英文职业感谢信 篇1

Gezhouba electric power co., LTD.

  On September 15, 20 * * on the official start of the construction of substation construction, civil engineering and mechanical and electrical projects fully opened, on the occasion of the arrival of the Spring Festival, all the staff of our company to a few months to fight hard in mar hydropower station my heartfelt thanks to the builders of a line, I wish you good health and smooth work, family happiness, all the best!

  20 * * years, your company contract to build the right bank of the transformer substation construction faces many difficulties, because the substation starts late, plant is located in the plateau caused by personnel equipment down effect, these difficulties are under your company's unremitting efforts and hard work were overcome one by one; November 20 * * soon has entered the winter construction, employees tend to be far from home, in the work bears hardships and stands hard work, overcome the poor construction conditions, weather, time and heavy task of construction difficulties, such as your company together take the bull by the horns, and on the right bank substation finished smoothly. This several months of continuous efforts, through your company in the past few months under the efforts of your company has basically completed the construction of transformer substation construction project goal and electromechanical equipment present goal, and implement the mar in hydropower station of "zero accident, zero harm" security management goal, for hydropower station safety management has accumulated rich experience. The achievement of these achievements and your company's support and efforts are indivisible. 20xx year will be a year of heavy tasks, and I hope your company will continue to carry forward the spirit of "self-improvement and courage to surpass", and ensure that 20xx is on April 15

  The right bank construction substation has the target of electric running.

  May the future work well with you.

英文职业感谢信 篇2

The leader of anxin property:

  I am the owner of ruijing new town community. On Saturday, March 30, 20xx, my mother went out of the house and left the key in the room. Panic, then mother rushed to the property security, just met we monitor how the monitor on duty and another young guard, to comfort my mother don't try so hard, the first call unlock company quickly. Because my son just ten months, alone in the house would be very dangerous, my mother was not frighten leg soft, cry doesn't know what to do, the lock to the company's people, our lock is a lift is locked up the sort of, very bad operation, worried when the monitor on duty in order to protect the property safety of the person of our residents, decisiveness, decided to lock the door, with the efforts of nearly an hour, finally opened the door, my son has no sound, thanks to your security, thank you! I inquire about are not enought to get the attendant's name, only know what monitor, their professional moral behavior is laudable, only in a short thank-you letter to express my deep gratitude. Their dedication and conscientious spirit deserve our study, and their efforts bring peace to our community. We live in such a harmonious community. I hereby thank you

英文职业感谢信 篇3

North China electric power design institute engineering co., LTD.

  The expensive unit appointed project manager li hui, zhang hao, GuanMing in my company in ningxia hui three comrades masters energy co., LTD., wind power pile foundation project and ningxia hanard energy co., LTD. Wind power construction of infrastructure projects, the others to stay away from home, in the work bears hardships and stands hard work, overcome the poor construction conditions, weather, time and heavy task of construction, such as difficulty, enthusiastic service construction unit always want to think, urgent construction units in need, excellent professional quality and high technical level of my unit, durability, ensuring duly completed construction gave great support and help. In early march, ephedra mountain first wind field, masters a period to start up, li hui, GuanMing fai, such as a person not afraid of cold, many times to the scene reconnaissance road, especially in front of the dynamic compaction in the transformer substation, in order to ensure that our dynamic compaction equipment into the construction site smoothly, li line in check road conditions on the construction site, the hard-working and supervise the construction of the road to speed up the construction of roads, many times after the dynamic compaction equipment for us to approach provides guarantee on schedule. In the process of dynamic compaction construction, as a result of ephedra mountains of bad weather, wind, dust, geological condition is relatively complex, lee a line into the scene, often know the situation, for our construction provides some good advice. The geological conditions are complex, causing the construction difficulty of pile foundation to increase, the speed is slow, and the construction progress of the whole project has also had a great impact. Li in this case, a line in a timely manner to find all relevant units, actively cooperate with our improvements, especially in the lee led off at 9 o 'clock on the evening of May 19, zhang and others to my project department meeting to discuss the pile foundation slowly and cooperate with mixing station, concrete casting 22:30 EPCM and others to check the construction site conditions, put forward the proposal, 30 points once again return to my project department to discuss the solution, especially puts forward good suggestion on the construction technology, now in the morning was dragged tired body back to the management company.

  On August 2, casting has been carried out to the third level, in the process of the casting foundation ring deviation is serious, is li management company, a line of the mountain patrol, found the problem, management company technicians in the construction site with our technician immediately research countermeasure, guarantee the construction quality of the whole of the pile caps.

  The morning of September 16 ephedra mountain under the heavy rain, heavy rain lasted four hours and the floods washed away the only two road to the construction site, was the construction of the project department technical personnel also trapped in the mountain, on both sides of a county middle block cannot pass, the mountain of 19 # #, # 21, 23 foundation pit was soaked by the flood, the situation is very grim, project department of pump cannot be sent to the mountains. Under the heavy rain is still a lot, my company project department worker to see in the eye in the heart, all you have to roll up trouser legs stand a just a pass in the flood will pump to the construction site. At this time, the management company li general line is also anxious, personally to the on-site command, timely cooperate with us to solve some difficulties and problems in the construction process.

  During the construction of the project, the three members of EPCM li hui's team often took pains to visit the site and supervise the work. In this regard, ningxia islamic geological engineering group expressed its heartfelt thanks.

  Through the construction of several wind power projects in ephedra, the islamic geological workers of ningxia are brought

  Cheng group and huabei electric design institute engineering co., LTD. Are closely linked together, and have a brotherly affection. In the future, we will continue to strengthen cooperation with your company to promote mutual development.

【关于英文职业感谢信3篇】相关文章:

1.英文职业感谢信六篇

2.英文职业感谢信9篇

3.英文职业感谢信集合六篇

4.英文职业感谢信范文6篇

5.精选英文职业感谢信四篇

6.英文职业感谢信汇总7篇

7.关于英文感谢信四篇

8.关于英文感谢信九篇

上一篇:致母校的感谢信 下一篇:领导感谢信